Tuesday, October 14, 2008
Previous Posts
- Close up view of the lower stringer channels in p...
- With the lower centre skin placed into position, i...
- With the lower centre skin placed into position, i...
- Notice the lower stringer channels have been trial...
- Mission accomplished!!
- History repeats for the lower portion of the left ...
- I now have all the left upper nose ribs' rivet hol...
- Now the nose ribs' rivet holes are drilled to #40 ...
- Main ribs' rivet holes at station 69 and 141.75...
- Just a proof that i did all those drilling.
0 Comments:
Post a Comment
<< Home