Tuesday, October 14, 2008

With the lower centre skin placed into position, i started to drill the stringer channel to the skin , making sure that the centreline markings are always visible through the pre-drilled rivet holes.
Posted by Picasa

0 Comments:

Post a Comment

<< Home